  • Working with a reference capacity header you are able to change relevant field content. False If you use a reference capacity, you are not able to change relevant fields inside header. If changes are needed, you have to change the reference
  • More than one bill of material (BOM) can have components allocated to the same routing. True
  • Which of the following is a method of creating routing material assignments? Create a material-specific routing.   Copy a material master record. The bill of material (BOM) and routing are automatically copied.   Create a material assignment in the routing header. Yes Create a material-specific routing.  No Copy a material master record. The bill of material (BOM) and routing are automatically copied.  yes Create a material assignment in the routing header.
  • Which of the following is not a prerequisite for component allocation? Backflush indicator must be set. Production version must exist. 
  • Any material component that you do not assign to an operation in the routing will, by default, be allocated to the first operation. True
  • You can assign each item in the bill of material (BOM) to only one operation in the routing. True
  • Component allocation to an operation is the only additional information that can be entered with regard to components. False    Hint According to the item category of the assigned components, you can make further decisions about how they are processed, such as backflushing of stock items or cutting the size of variable-size items.
  • Suboperations can be used for more detailed capacity planning and costing. True
  • When suboperations are used, costing is automatically performed at operation level regardless of the control keys. False When using suboperations, it is important for you to ensure that costs and capacity requirements are not calculated twice by using the appropriate control keys.
  • You can use user-defined fields to assign data fields to an operation or suboperation for information purposes only. False Hint:  You can use user-defined fields to assign data fields to an operation or suboperation. You can enter business information or values for the formula parameters that the standard system does not include. The values for formula parameters could be used for calculating capacity requirements, scheduling, or costing.
  • Anzeige
  • You can store __________ production version(s) for different lot size intervals in the material master. Multiple
  • Which master data are part of a production version? Material Bom  Routing
  • Inside your SAP system, you can assign various production resource tools to an operation in a routing. True
  • PRT is another name for a component that is used in production. False Hint: PRTs, such as components are needed for production but are not consumed in the same way, making them very different to components. 
  • Which of the following are ways of making changes to routings in SAP ERP? All Above hint:  You can make changes to a routing without history, with change documents, or with history using ECM. 
  • A where-used list can show you the task lists that will be affected by a change in a work center. True
  • It is not possible to make mass changes to routings using an engineering change management (ECM) number. False Hint:  You can make changes to routings using the mass change function and an engineering change number. This means, that the changes take place at a particular date. 
  • Which of the following controls the engineering workbench (EWB)? Cockpit
  • The cockpit is used to display the hierarchical relationship of objects in the overview screen. True
  • A phantom assembly is usually created within engineering to describe a number of components and to manage them as a whole. True Hint: In the engineering department, maybe CAD construction area, often components are managed in an assembly, which can’t be assembled. Therefore you have to mark them as a phantom assembly. 
  • Phantom assemblies facilitate ________________. component assignment  simple structuring of BOMs
  • The components in a phantom assembly are ________________. immediately placed into the superior assembly 
  • The highest level to determine a part as a phantom assembly is the ____________________ level. Material Master
  • Co-products, by-products, and waste products are materials in the BOM that you can choose for production and are provided from stock. False Hint: Co-products, by-products, and waste products are materials in the BOM that are created at the same time as the main product. The main product cannot be produced in isolation without producing these. 
  • One of the differences between co-products, by-products, and waste products is their inventory valuation and settlement. True
  • A component with a negative quantity exists in a BOM. Select each of the following answers that could apply. A co-product  A by-product  A waste product  
  • In order to use a material in a BOM as a co-product, you must first enable it to be used as a co-product in the material master. True
  • A component is replaced by a follow-up material when the stock available for material requirements planning of the discontinued component is zero. True Hint. A component is replaced by a follow-up material when the stock available for material requirements planning of the discontinued component is zero. A direct component change inside material BOM is also possible, but then question is then, what to do with the materials on stock of the old component. Be aware of the following, this scenario of replacing a component takes only place inside material, not inside material BOM. 
  • All assembly materials can be entered in the same __________ item group. Alternative All assembly materials can be entered in the same Alternateive item group. 
  • Which of the following is carried out when the stock available for material requirements planning (MRP) of the discontinued material is zero in simple discontinuation? The dependent requirements are diverted from the discontinued material to the follow-up material.  The follow-up material is acquired (in place of the discontinued material) if it is not available for material requirements planning.
  • Anzeige
  • The plant and usage are part of the unique key that identifies a BOM. True
  • If you want to assign one name to all alternatives in a multiple BOM, you have to enter a BOM group in the ____________. BOM Header If you want to assign one name to all alternatives in a multiple BOM, you have to enter a BOM group in the BOM Header. 
  • When a single material consists of more than one list of components, which of the following is used? Multiple BOMS
  • A product made of different combinations of components is often represented by BOMs alternatives. True
  • Which of the following situations help a user to create a variant? The base unit of measure of the variant materials is the same. A BOM does not already exist for the material.   Hint: Normally, you start with the creation of a standard BOM for an existing material. When you now create a new material, which is nearly the same as the first material, but has a different material number, you connect this material with a variant BOM to the existing one. Several header materials are connected to one BOM. 
  • You can convert a multiple BOM into a variant BOM. False
  • Identify the various types of BOM. Simple  Variant  Multiple
  • Complex products mean complex configuration tasks in both _________ and __________. Sales & Production
  • Parallel sequences are special types of overlapping operations. True
  • In the simplest case, a routing has one sequence, the __________ sequence. Standard
  • You can create parallel sequences in which of the following task lists? Routings  Rate routings
  • Which of the following are possible reasons for alternative production methods? All above Producing the same material with different routings, which can be from different plants  Manufacturing a single product with one BOM using different technologies  Using an automatic assembly line for large quantities and a manual assembly line for small quantities  All of the above
  • Which of the following is the main reason for an alternative production method being required for different production lots? Efficiency
  • A product can have a maximum of 100 alternative bills of material (BOMs). False  Max is 1000
  • A reference operation set allows for parallel and alternative sequences. False Hint:  When you create a reference operation set, you are not able to define other sequences than the standard sequence. 
  • A reference operation set is a standard operation sequence for performing a task that is frequently used. True
  • Which of the following can you assign to an operation in a reference operation set? All Above
  • If you copy a reference operation set from a routing, only the basic sequence is copied. True
  • The in-house production time for a __________ can be calculated using lead-time scheduling. Material
  • If material requirements planning (MRP) is carried out without lead-time scheduling, it calculates capacity requirements. False